Sunday, February 24, 2013

Catch-up post - Flooring with the Schindlers part deux

We're taking it back to the oldschool...
So this post is the post to catch up on floors which were done almost two years ago now.
MUCH credit and thanks go to Bryan and Amber Schindler.

Basically - we did it over the course of two days. Complete demo (there was some linoleum tile under the hallway), lots of vacuuming, some concrete filling and patching along the edges of the slab, vapor barrier and then floors. With many trips to the chopsaw and a lot of time on hands and knees tapping it together, the flooring looked beautiful. Trim needed to be done still, but with less than a week until Rory's debut (little did we know at that time) it came together right as it needed to.


No comments:

Post a Comment